top of page
Port and Waterfront Facilities

Cruise Terminals, Shipping Facilities, Terminal Offices, Lighting and Utilities.

Central Chiller Plant and Cooling Tower Replacement – Riviera Beach, Fl

Provided MEP engineering design services for addition and modification of central chiller plant for headquarter office building: design of HVAC systems and controls for central air cooling of the executive suites, including installation of cooling tower. 

Central Chiller Plant and Cooling Tower Replacement – Riviera Beach, Fl

Port Manatee Terminal Office & Warehouse - Port Manatee, FL 

Provided MEP engineering design services for power distribution system, lighting, communications, lightning protection, fire alarm systems, and parking lot lighting.  The 47,000 SF multi-use facility includes: cruise terminal, Port Authority headquarter offices, Crown Cruise line offices, and shipping zone (two refrigerated warehouses with125 linear feet of docks). 

Port Manatee Terminal Office & Warehouse - Port Manatee, FL 

Tropical Shipping Company Facilities - Freeport, Bahamas

Provided MEP engineering design services for 2 dry dock slips, metal fabrication workshops, and office building.

Tropical Shipping Company Facilities - Freeport, Bahamas

Lighting at Port of Palm Beach - Riviera Beach, Florida 

Provided MEP engineering design services of high mast lighting for the yard for shipping containers for night time and security operations. 

Lighting at Port of Palm Beach - Riviera Beach, Florida 

Night-time Lighting at Port Canaveral – Cape Canaveral, FL

Provided MEP engineering design services for nighttime lighting to accommodate pedestrian traffic and service equipment used to maneuver passenger ramps to ships:  ramp lighting for various piers including those used for large 2,600 passenger cruise ships.

Night-time Lighting at Port Canaveral – Cape Canaveral, FL

Cruise Terminal, Port of Houston - Houston, TX

Provided MEP engineering design services for100,000 SF cruise terminal. 

Cruise Terminal, Port of Houston - Houston, TX

Cruise Terminal No. 4, Virginia Port Authority - Norfolk, VA

Provided MEP engineering design services for medical office space.

Cruise Terminal No. 4, Virginia Port Authority - Norfolk, VA

Fire Simulator for Resolve Salvage and Towing - Port Everglades, FL

Provided MEP engineering design services for lighting and fire alarm systems for use in training drills for firefighters.

Fire Simulator for Resolve Salvage and Towing - Port Everglades, FL

Galveston Cruise Terminal - Galveston, TX 

Provided MEP engineering design services for renovation of 100,000 SF warehouse for use as a cruise terminal. 

Galveston Cruise Terminal - Galveston, TX 

Tampa Terminal # 2, Tampa Port Authority - Tampa, FL

Provided MEP engineering design services for renovation and addition of passenger waiting and luggage areas for Carnival Cruise Line’s terminal.

Tampa Terminal # 2, Tampa Port Authority - Tampa, FL

Freeport Ship Care Facility - Freeport,Bahamas

30,000 SF dry dock and maintenance facility

Electrical Service: 400 Amps, 480Y / 277 Volt, 3 Phase, 4 Wires

Freeport Ship Care Facility - Freeport,Bahamas

Sopers Hole Ferry Terminal - Tortola, British VI

60,000 SF passenger ferry terminal with solar, on-site generator and utility power

Electrical Service: 2000 Amps, 480Y / 277 Volt, 3 Phase, 4 Wires

Sopers Hole Ferry Terminal - Tortola, British VI

Port of New Orleans - New Orleans, LA

50,000 SF renovation for use as cruise terminal with addition of gangways

Electrical Service: 1600 Amps, 480 / 277 Volt, 3 Phase, 4 Wires

Port of New Orleans - New Orleans, LA
bottom of page